Instructions for connecting gas in the Leningrad region

How to get GAZ to a Private House in the Moscow Region for pennies?

Yandex Photo

Despite all the benefits of having gas in your private home, installing gas is the main obstacle on the way to cheap “blue” fuel.

After all, in order to supply gas to your home, you have to fork out a lot.

Today I will tell you how I saved on bringing gas into the house /MosOblGaz/.

Yandex Photo

Why am I talking about this now, when it’s winter time, because a spoon is good for dinner

, it was at this time that I managed to reduce the price for construction and installation works (construction and installation works) as much as possible. Basically, many people put off this issue until the weather warms up and in vain, since there are many customers, Gorgaz does not have time and, as a result, not only do you not see discounts, but you also have to wait your turn.

More details about how I managed to reduce the cost of Gasification at home can be found here by following the link.

The first thing we did on the way to saving. The house on the site was well planned. The house was placed in such a way that it was closer to the gas pipe. This is the first thing. Secondly, the boiler room itself in the house was placed as close as possible to the gas connection point. Thus, future construction and installation costs were reduced.

Yandex Photo

Of course, I dealt with gasification and all the documentation for the house, as well as saving on communications and purchasing all materials for the house myself.

Men, as a rule, do not have time to do this, as they are busy with construction.

And, having saved a ruble in construction, it then turns into at least 100 thousand. In total, I managed to save more than 100 thousand rubles on gasification of my house...

Yandex Photo

The following...what I managed to save on. TP agreement ( technological connection

) . When I filled out an application for technical specifications in my personal account on the MosOblGaz website, they sent me an agreement for technical support in the amount of 70 thousand rubles.

This is despite the fact that the distance to the object is only 8 meters and the object belongs to category 1. Yandex Photo

Naturally... I was outraged by this and I sent a second application, attaching a topographic survey of the site as evidence. A new agreement has arrived. Where the amount for TP was already 35 thousand rubles. And this amount only includes cutting into the pipe and starting the gas!

It is also necessary to prepare a gasification project, etc.

Of course, according to the law, the gasification project is not mandatory.

But MosOblGaz has its own laws, it is still a commercial, not a state-owned enterprise and sets its own conditions and prices

We have to either silently agree to their terms, or sit without gas for years and go to court, or find some other way and seek discounts. I chose the last option. I sought the maximum discount.

Yandex Photo

To calculate construction and installation work, a gasification project is required. And you also need to pay for the project... Someone is looking for a third-party organization that has permission...

Someone orders online from other companies located in other cities... I tried to find a third-party organization to prepare the project at the lowest price possible. But I didn’t find it...

And I decided to do everything through MosOblGaz, so that there would be no issues with connecting gas later.

The asking price for the project was 36 thousand rubles.

Yandex Photo

You name all the equipment to the designer, but the only thing that is included in the project by default is a prepaid meter with smart cards. And no other... Otherwise the gasification project will not be approved! Either the meter specified in the project or the construction and installation work will not be carried out for you and you will be left without gas! These are the conditions you want to agree to, or defend your rights.

I decided to defend the rights, at least for the meter, and began to strive to include in the project a mechanical meter, the most convenient one.

After the project was ready, with the agreed meter, it was transferred to the Construction and Installation Department for an estimate. As a result, the estimate for the work amounted to 150 thousand rubles. This despite the fact that the distance to the pipe is only 8 meters.

My indignation knew no bounds. To the question Why? They answered me briefly: if you don’t like it, go look for something cheaper, but come back to us anyway. We have our own prices, we are a joint stock company! This is the answer I was given...

A week later, I came again and asked for a discount, after thinking a little, the employee went somewhere and returned saying a maximum of 10%... That's all that is possible... As a result, the price dropped to 135 thousand rubles.

And I left the contract with the project until next year (the contract period is 1 year), there was still time to think about it).

I dealt with all this gas red tape during the process of building a house, starting from the moment the foundation was poured.

The next year, in the spring, in March, before the snow had melted, I received a call from MosOblGaz with complaints and began asking questions... Well, what? When will you pay for construction and installation work?... Our plans are on fire...

When do you plan to carry out the work? I answer in a misunderstanding... Well, how will I save money...

They say there’s not enough money... And I myself can hear in the background on the phone how they’re swearing there...

One of the bosses was yelling, I’m re-firing you all, look for the plans wherever you want...

At the end of the conversation, I began to think. And the idea came to my mind to make them an offer that they were unlikely to refuse...

I decided to go to Gorgaz and offer them to carry out construction and installation works on me for the amount that I had on hand - 110 thousand rubles. And not 135, as they asked earlier. Naturally, they agreed and in early April they gave me gas.

Yandex Photo

As a result, initially the entire amount for gasification was 282,000.... After my efforts and a little legwork, I managed to pay off more than 100 thousand rubles for gasification. Agree, this is a decent amount. The total amount for bringing gas into the house was 180 thousand rubles.

Important points about Maternal Capital

✔What do people regret after building a house?

✔All processes are clearly illustrated for Gasification of a Private House

Source: https://zen.yandex.ru/media/id/5ded59f61a8608050f2a76b9/kak-za-kopeiki-provesti-gaz-v-chastnyi-dom-v-podmoskove-5e2cc8fd78125e00b13d5b21

Installation of gas meters in Moscow

If there is a need to install a gas meter, you should perform a certain sequence of actions:

  1. Submit an application for installation of a meter to an organization that has a license for such types of work. In Moscow, such an organization is Mosgaz . There are several options for submitting an application - by telephone or via the Internet. In the first case, the customer service office hours are all days except Sunday, from 08:00 to 22:00. Phone number for submitting an application +7 (495) 660-20-01 . When applying for installation online, the time and day of application do not matter;
  2. Wait for a call back and agree on the exact time of arrival of the specialist;
  3. On the day of arrival of the Mosgaz employee, ensure accessibility of the gas meter installation site. Prepare the meter itself and a passport for it. After carrying out all the necessary work, pay the cost according to the price list provided and sign the certificate of completion of the work;
  4. The Mosgaz specialist will provide receipts for payment for installation work and make a note in the gas meter passport;
  5. After installation, you need to contact the gas supplier. In Moscow this is Gazprom Mezhregiongaz Moscow LLC . Contact details and addresses of the company's offices can be found on their official website;
  6. An employee who arrives at the scene will put a seal on the meter and take the first readings;
  7. After this procedure, your personal account will become available to you. With its power, you can make payments and transmit gas meter readings.

Read also: Topping up your Moscow social card

There are cases of installing a meter in which it is necessary to change the gas wiring inside the apartment or move existing gas appliances. All this work can also be performed by a Mosgaz employee. The cost of such services and the rules for their provision can be found on the organization’s website.

to contents ^

How to supply gas to a private house in the Moscow region? Sequence of steps, timing, cost

04.02.2019

Gas / Gasification in the Moscow region

We built a house, struggled for a long time with electric heating (stove, diesel boiler, etc.) and finally got around to it - it’s time to use gas... This thing is frightening with uncertainty and misunderstanding of where to start, how to continue and how much it will cost in the end - in the end ? Let's try to figure it out together.

Gasification of a private house. Deciding on the terrain

First, let's determine where you are. The fundamental question is: is there gas in your locality or not? If not, then the situation becomes seriously complicated.

In this case, it is necessary to study whether the settlement is included in the gasification program of the Moscow region. This information can be viewed on the Mosoblgaz website - https://www.mosoblgaz.ru/gazification/list/.

In other regions there are investment programs, which can also be found on the GRO websites.

If your locality is not on the lists, then things are really sad. The law does not provide for the possibility of gasification by contribution, as was previously accepted. But Mosoblgaz meets collective applicants and accepts applications from non-profit partnerships formed by a group of citizens.

Let’s make a reservation right away: members of any Non-Commercial Partnership will receive gas at the borders of each section of the partnership member, and in 80% of cases the pipe built under the connection agreement will belong to the State Unitary Enterprise MO Mosoblgaz. This procedure is not easy and requires a separate discussion. Things are completely different in SNT.

And this problem also needs to be considered separately.

But let’s assume you have gas in your village (village, town). Let's take an ideal case - a pipe runs along your street at a distance from several meters to several tens of meters. What is the algorithm of action in this case?

Gasification of a private home: who owns the nearest gas pipeline?

We start with the fact that you need to find out whose property is the “pipe” closest to your house (land).

Most of the low-pressure gas networks in the Moscow region belong to Mosoblgaz (a state-owned enterprise responsible for gasification and gas supply in the region).

However, there are also numerous private or departmental gas pipelines that belong to other owners.

But we assume that your house meets the requirements for “first” category properties. In this case, the summary will be as follows:

your expenses will consist of two parts, expenses for work (design, construction and installation work, equipment and materials) on your site and work outside the site.

  • It is difficult to predict the cost of completing the first part in advance, but not less than several hundred thousand rubles.
  • There is more clarity regarding the second part - 65,072.25 rubles in 2019 (the price is fixed even if the source is 1 meter from your site). This is if you fall into the most preferential group of those connecting (consumption less than 5 cubic meters per hour, the distance to the existing gas pipeline is less than 200 meters, the pressure at the source is no more than 0.3 MPa and only the construction of a gas inlet pipeline is required).
  • The time for connecting gas will be from a year to a year and a half (if you again fall into the preferential group). It's unlikely that you can do it faster. Most likely the process will drag on.

Upon completion of the work on your part and on the part of Mosoblgaz, you sign the necessary acts. Sign a contract for gas supply. Agree on the time to start the gas. Next - enjoy))

A little conclusion

Life, unfortunately, is not as simple as we would like. And in your case, gasification of your home may be complicated by additional problems and circumstances. However, we hope that our explanations have at least clarified for you the general logic of the process, where to go and who is responsible for what on the topic of gasification of a private house in the Moscow region.

As for the legislative basis of the process, the key in this area is the decree of the Government of the Russian Federation “On approval of the rules for connecting (technological connection) of capital construction projects to gas distribution networks, as well as on amendments and invalidation of certain acts of the Government of the Russian Federation” dated December 30, 2013. N 1314.

If in your communication with Mosoblgaz you plan to rely on a solid knowledge of your rights, be sure to read it.

Well, and most importantly, without delay, submit your application for gasification to Mosoblgaz. The sooner you get down to business, the sooner you will have clarity regarding the very possibility of gasification and its cost.

Representatives of Mosoblgaz assure that it is better to submit an application through your Personal Account. And there you can conduct all communications with gas workers. Unlike telephone calls and personal consultations, correspondence through a personal account will be official. And you, if necessary, can use this circumstance to your advantage.

Source: https://energovopros.ru/issledovania/2335/2389/40800/

Benefits for labor veterans in paying for gas in Moscow

Here, labor veterans are entitled to the following privileges: Only those persons who permanently reside on its territory can take advantage of benefits in the Sverdlovsk region. These benefits include: We live in Kaluga. Age over 70 years.

In addition, Labor Veterans are exempt from the costs of major repairs of public premises, and also receive a discount on maintenance of the local area. Each region has adopted its own program regulating the process of providing compensation.

Gasification of a private house: connection stages, requirements, documentation

The process of gasification at home is a technically complex and costly undertaking. It is the material issue that is often the main obstacle to providing a building with the most economical method of heat supply. However, the costs of laying a gas pipeline can be recouped in the coming years, provided that the connection is made in compliance with the requirements and the approval of all documents.

Without a full-fledged heating system, ensuring comfortable living in winter is quite problematic. For heating, you can use various types of heating equipment - electric, solid fuel, powered by solar energy. However, gas boilers have been considered the most effective and reliable solution in organizing heat supply for many years.

How to gasify a private house for heating and hot water preparation:

Connection to central gas supply

It is considered the most common option.

If there is a gas main on the street where the house is located, you can contact the gas utility at your place of residence and gasify the building using its services.

Central gas supply is safer compared to an autonomous system (gas holder) and requires homeowners to periodically adjust the parameters of the gas boiler.

Gas tank installation

Gasification of a country house using gas tanks is resorted to in cases where it is impossible to connect to a centralized main line. Gas holder systems are designed to store relatively small volumes of natural fuel - on average from 2,500 to 20,000 m3, but can provide buildings with the necessary gas reserves year-round.

Application of gas generator or biogas equipment

Gas generators and biogas plants are a rare phenomenon in Russian realities. They are highly efficient and, with proper planning, supply the home with sufficient amounts of fuel. However, some consumers are put off by the need to allocate large areas for their installation and take care of constant supplies of wood, manure and other materials for gas production.

If you decide to gasify your home by connecting to a gas main, first you should find out in whose jurisdiction the gas pipeline running nearby is located. As a rule, it is managed by the local Gorgaz, which should be contacted to obtain permits and the necessary documentation.

The first document required for laying a gas pipeline is technical specifications. Specifications are a permit to connect to the main line, according to which the gas distribution organization (GDO) guarantees an uninterrupted supply of natural fuel and maintenance of its pressure at the proper level.

What documents need to be submitted to the State Registration Office to draw up technical conditions for gasification of a house:

  • a request for the issuance of technical specifications indicating the planned launch date of the gas pipeline and the expected gas consumption;
  • copies of certificates of ownership of the plot and building;
  • copy of ID;
  • calculations of maximum fuel consumption (when used over 5 m3 per hour);
  • plan of the site and adjacent territory;
  • consent of the owner (if the documents are submitted by the tenant);
  • power of attorney (when submitting documentation by a representative).

The development of specifications is carried out by GRO specialists. The finished document must specify: hourly fuel consumption, timing of pipeline connection and period of validity of technical conditions.

After issuing the specifications, you need to draw up an agreement with a design bureau - GRO or a third-party company that will prepare a project for gasification of the house. To prepare the agreement, you will need a topographic plan of the site, technical passports for the building and installed equipment. If necessary, the designer can visit the site to take measurements and clarify details.

After receiving the finished project, you will need to coordinate it with the technical department of Gorgaz, as well as enter into an agreement with the State Distribution Organization for technical supervision, which requires a chimney inspection report. Another necessary document is an agreement for the connection of natural fuel, which is drawn up with the gas distribution organization at the request of the owner.

Drafting

A gasification project for a country house is a mandatory item when carrying out installation work, allowing you to correctly plan the wiring, calculate and select the necessary equipment. Visually, it looks like an explanatory note of several sheets, which reflects:

  • floor plan of the building indicating the locations of pipes and devices;
  • energy efficiency parameters of the facility;
  • gas equipment specification;
  • installation estimate;
  • justification for choosing one or another installation method;
  • precautions and protection measures.

On the last pages of the project, special conditions for the work are prescribed and an assembly drawing is placed that defines the features of the placement and welding of pipelines. The cost of the project for gasification of a private house can be established in accordance with FAS Order No. 1151 (upon contacting the State Distribution Organization), or at market prices if the document is ordered from third-party organizations.

Construction and installation works

After preparing the documentation, it is necessary to draw up an agreement with the organization that will carry out the installation work. The selected company must have a license and permits to carry out such activities. The entire gas supply process can be divided into several stages:

  • Laying an external gas pipeline.
    The pipeline from the central highway to the site can be laid underground or above ground. When choosing an underground gasification method at home, pipes with a diameter of 15 cm are used, which are placed in pre-dug trenches. A gas control point is installed in the local area, designed to normalize the pressure of natural gas.
  • Boiler room installation.
    Preparing the premises for equipment installation is carried out simultaneously with external work. As part of this work, the necessary equipment is purchased and installed, the boiler room is finished in accordance with the requirements of the fire department and the gas industry, and places are prepared for the entry of the gas pipeline. The boiler room must be equipped with a chimney and an artificial or natural ventilation system. Similar preparations are carried out in the kitchen where the gas stove will be located.
  • Connecting communications.
    At the last stage of gasification of a country house, a pipe is inserted into the building and connected to the main riser. After the assembly is completed, control and measuring instruments are connected - a meter, various sensors, shut-off valves.

Before launching the gas supply system, it is checked by the UGC commission, which draws up a corresponding act.

To carry out the first gas launch, it is necessary to obtain permission from the State Distribution Organization to put the pipeline into operation. In addition, it will be necessary to conclude an agreement for the supply of natural fuel.

Please note that the gas supplier and gas distribution organization are not always the same company.

When the system is actually started, the functionality of all devices is checked and pressure indicators are established. The absence of gas leaks is also monitored. If no problems are identified, a connection certificate is signed, which confirms that the building is gasified.

Installation requirements

When gasifying a house, it is necessary to strictly comply with the requirements for laying a gas pipeline and performing other installation work:

  • The depth of placement of pipes on the site should be 1.25–1.75 m from the ground surface.
  • Where the pipeline enters the building, the pipes should be placed at a depth of 0.75–1.25 m.
  • It is allowed to conduct the pipeline inside the building both through the wall and through the foundation.
  • The distance from the gas pipeline to heat, water supply or sewer lines must be at least 0.2 m vertically. For telephone and electrical cables, this parameter is at least 0.5 m.
  • When laying steel pipes in the ground, care must be taken to waterproof them, which will prevent the development of corrosion processes.
  • As part of the gasification of a private home, it is prohibited to install risers and distribution networks in residential premises.
  • Do not lay the gas pipeline through chimneys or ventilation ducts. Pipes should not cross the openings of doors and windows, and when they are placed in places where people pass, they should be at a height of at least 2 m.
  • The gas pipeline is introduced into the building and routed through the premises only through steel pipes. It is unacceptable to use polyethylene pipes for above-ground gas pipelines. They are not used in regions with increased seismic activity or in places where air temperatures can drop below -45 °C.

Requirements of the Federal Law on gasification of a private home

The procedure for gasification of a country house is determined at the federal level, that is, gas services and local authorities do not have the right to establish their own or request additional documentation.

According to Federal Law 69, 1314 and a number of other regulations, when connecting to a centralized pipeline, the following requirements must be observed: Only capital construction projects, including residential or industrial buildings, the construction of which has not yet been completed, are allowed to connect to the gas distribution network. It is unacceptable to gasify non-permanent buildings - greenhouses, garages, summer kitchens and other structures without a foundation, as well as separate residential premises in apartment buildings. An application for gasification of a house can be made by the owner or tenants who have the written approval of the owner of the property. If there are several owners in the building, the consent of each of them is required.

The period for issuing technical specifications by the gas distribution company cannot exceed 14 days. The technical specifications are considered valid for no more than 70 days; after this period, the document will need to be reissued.

The gas connection period cannot exceed 9 months for applicants of the first category (with a maximum fuel consumption of up to 20,000 m3), unless they require permission to build a gas pipeline with a capacity of up to 0.6 MPa. If necessary, obtaining permission to connect is given no more than 12 months. For other categories of consumers, gasification of a private home is carried out within a period of no more than 1.5–2 years.

The main difficulty in organizing gas supply is compliance with legal regulations and a large number of approvals, which require a significant investment of time and effort.

Use the service to make the task of laying a gas pipeline easier.

We are participating in a program to provide natural fuel to the Moscow region and are working to create a simplified gas connection system accessible to every resident of the region.

Our specialists are ready to provide qualified services for connecting to distribution networks in strict accordance with the rules and requirements.

In addition, in our online store you can buy equipment for home gasification, including boilers, meters, geysers and stoves.

All products are sold at a competitive price and can be promptly delivered to your address in Moscow or throughout the region.

Source: https://shop.mosoblgaz.ru/articles/gazifikatsia-doma/

Benefits for labor veterans in paying for gas in Moscow

The award is not given to all retirees. Today, a special certificate is issued, which can be applied for by every pensioner who has sufficient work experience and worked during wartime.

Pushkino. According to the federal law “On Veterans” (as amended on July 1, 2013), after a labor veteran is assigned a pension, he receives the right to use public clinics free of charge, as well as the right to receive full and qualified treatment in municipal and state healthcare institutions.

Gas benefits for pensioners, disabled people and other categories of citizens

Connecting gas to your home is not a free procedure. In some cases it even turns out to be very expensive.

There are cases when a gas company charges 150-200 thousand rubles for connecting gas to a private home. As for simply connecting household appliances in an apartment, the price range is much lower.

But the price will be even lower if you fall into the category of citizens who are entitled to benefits.

Who is entitled to benefits when connecting gas to a house?

The law establishes a certain category of persons who are entitled to benefits when connecting gas to a private house or apartment. These include people who have reached retirement age, disabled people of the first, second and third groups, large families, veterans, as well as widows of combat veterans, blockade survivors and liquidators of nuclear power plant accidents.

Analyzing the above, it can be noted that citizens of a certain category can and should apply for compensation for gas supply costs. Firstly, this is determined by the laws of the Russian Federation, and secondly, prices for connection and gas supply services in the current realities are quite high. Therefore, if there is such an opportunity to save money, then why not.

Source: https://domsgazom.ru/podklyuchenie-gaza/lgoty-na-gaz-pensioneram

The process of conducting gas is very labor-intensive, but it is unnecessary to talk about its benefits, since the high cost of the complex of works will ultimately be paid off by the low cost of operating the coolant (gas) itself. The process can be called labor-intensive for both parties involved.

For installers, it involves laying pipes underground (this is especially difficult to do again, that is, where gas pipelines are not developed), and for consumers, the difficulty lies in completing a large package of documentation. But our material will describe in detail the optimal plan of action for the average citizen.

In addition, it should be noted that after the adoption of new rules for connecting private houses to the gas system, only state gas services are dealing with this issue. Also, do not forget about the Federal Law “On Gas Supply,” which divides all gas consumers into categories.

But in the overwhelming majority of cases, owners of private houses whose area does not exceed 250 m² fall into the 1st category, consuming no more than 5 m³/hour of gas (which is actually enough for optimal heating of a house of the specified area).

Step by step procedure

Initially, it is necessary to decide on the free time that the owner of a private house has, since the process of collecting and processing documentation is very long and includes bypassing many authorities.

Now there are a sufficient number of companies on the service market that deal with the preparation of documentation, but the prices for the cost of work depend entirely on the nature and complexity of the work to be done.

Thus, the average cost of services for registration of a full package starts from 100,000 rubles.

Stage No. 1: Obtaining technical specifications for the gasification project.

Specifications are obtained from the state gas service, this can be oblgaz or gorgaz. They are responsible for laying gas pipelines, as well as putting them into operation. In addition, they have the exclusive right to sell gas to the population. When applying, you must have a number of documents with you:

  1. An application in the prescribed form requesting the issuance of technical specifications for the project;
  2. Photocopy of the passport of a citizen of the Russian Federation;
  3. Documents confirming ownership of a house or land for it. Here it is necessary to clarify that if the house has already been put into operation, then any document confirming ownership will be sufficient: a sales contract, a technical passport, and so on. If the house has not yet been built, then it is necessary to submit an agreement on the purchase of the land plot and registration of its ownership;
  4. Detailed plan of the location of the house on the site.

An important point is the fact that connecting a private house to gas is possible only if the area (where the house is located) falls into the general gasification plan for the area. Moreover, gas services pay attention to ensuring that connecting a new consumer is technically possible.

That is, consumption of 5 m³/hour of gas by a new consumption point should not reduce the pressure in the network (other consumers should not suffer). Also taken into account is the distance of the plot of land (or house) from the existing gas main, which should not exceed 200 meters.

The project preparation period lasts about a month, and its cost will be from 1,500 to 3,000 rubles.

Stage No. 2: Technical connection.

After the package of documents described above has been compiled and approved, gas is directly supplied to the site.

The technical connection is made from the existing gas main to the plot of land (or plot with a house).

The approximate cost of such work depends on its complexity and terrain features and can range from 23,000 to 50,000 rubles. But this is not the final stage in the connection; it is not yet possible to supply gas to the house.

Stage No. 3: Drawing up a project for gasification of the house.

The money spent in the first two stages is, so to speak, “flowers”. The most difficult and costly stage is drawing up and approving a project for gasification of a private home.

Here, too, two options are possible: a personal application to Gorgaz or Regional Gas, but most often the state gas service delays the registration process for more than six months, or an application to a special company that has permits for carrying out this type of activity.

Option two is more expensive, but faster and more reliable. In any case, the final version of the documents must contain:

  1. Detailed technical characteristics of connected devices and their complete list;
  2. A plan diagram for the location of appliances in the house with strict adherence to all compliance rules - organization of the chimney and compliance with safety regulations.

After receiving these documents in hand, all that remains is to select a contractor to perform the final installation of the gas main in the house.

Stage No. 4: Project implementation.

After all the documentation has been completed, it’s time for the final installation of pipelines and devices.

It is best to entrust the work to one organization that specializes in universal work (installation of a gas pipeline into the house and installation of appliances).

As soon as all the work is completed, it is necessary to again contact the city gas or regional gas agency with a request to conduct an inspection of the newly installed equipment.

Stage No. 5: Checking equipment and starting gas.

Representatives of Gorgaz, after a personal request from the owner of a private house, must carry out an inspection. This may take up to 3-4 weeks. If the inspection is successful, a certificate of technical supervision is issued.

Next, you need to collect absolutely all the documents (from stages 1 to 5) and resubmit them to the city gas agency. Within 21 days, city gas workers must come to a private house to seal the gas meter and draw up an agreement for the supply of gas to the house.

Gas is introduced by opening the valve located in front of the gas distribution fittings, and it is prohibited to open the valve without a gas service employee.

Further, in order to avoid possible unpleasant situations, it is better to order and pay for the service of checking gas fittings, after which a document will be issued confirming the serviceability of the equipment.

As a result, we have total costs for documentation from 300,000 to 700,000 rubles (excluding funds spent on the purchase of gas equipment: boiler, water heater, etc.

), 6-9 months of wasted time and a fully gasified house. It sounds a little scary, but the gas method of heating a house does not pay for itself in such a long time.

Operation and coolant costs are much cheaper than solid coolants or heating using electricity.

Benefits for gasification of a private home

In our country there are a large number of categories of the population that are actively supported by the state by providing various benefits.

These include low-income families or individual citizens, veterans of World War II or other military operations, large families or single parents with many children, and disabled people.

But the current federal legislation, unfortunately, does not provide any benefits or concessions for the gasification of private homes. There are various benefits for paying for the same gas and for housing and communal services, but there are no benefits for pipeline construction.

Benefits for labor veterans in 2020 for gas payments in the Moscow region

Thus, at the regional level, the following benefits have been introduced for pensioners and labor veterans: Previously, compensation for major repairs was paid in this region, but from 2020 its payment was stopped due to the need to preserve the regional budget.

If a citizen is connected to the MGTS line, then no documents are submitted for compensation; the benefit to the labor veteran is accrued automatically. Capital veterans have the right to free travel on public transport (except for taxis and minibuses).

Benefits for labor veterans in paying for gas in Moscow

This is the unchanging list of benefits that all labor veterans in the Russian Federation have the right to enjoy, regardless of their place of residence: Preferences for payment for housing and communal services can only be received if there is no debt on utility bills for:

The main benefit for labor veterans is a monthly 50% discount on utility bills. This discount is provided in many regions of the country, but is implemented under different conditions. The peculiarity of the benefit is that it is calculated on a separate receipt.

How does gasification occur?

It is required to hold a meeting and make a decision on the work to be carried out. The gasification procedure consists of the following steps.

  • Obtaining permission to install a gas pipeline and preparing documents that reflect the throughput of the structure for supplying fuel.
  • Creation of a project for supplying fuel to buildings.
  • Calculation of a new network taking into account existing ones: water supply, sewerage, electrical cables, and so on.
  • Selecting equipment to complete the project according to established standards.
  • Pipe laying.

The majority of the partnership votes “for”. After this, gasification of the SNT house in the Leningrad region begins. According to Law No. 66, if half of the members of the assembly make a positive decision, then the minority participates financially in the process.

Based on the cost estimate, the contribution amount and payment schedule are formed. If the participant has not yet built his own house or building, he is nevertheless required to pay. Builders are bringing a pipe with a cap to the site.

Gas connection benefits

Attention

Initially, you will need to go through several levels at once in a government agency that has the competence to issue permission to conduct such procedures. Then the organization provides workers to carry out gasification, and at the end of the procedure, the installed equipment is checked with certification - the issuance of an appropriate certificate indicating suitability for work.

Based on this document, it will be possible to subsequently seal it. As for the final cost for all the services listed, its average value fluctuates around 600-750 thousand rubles. The implementation time is also considerable - from six months to 10 months. Such numbers may scare many, but in fact this is a very profitable investment that will quickly pay for itself and allow you to live comfortably in your own home.